MULBERRY HIGH SCHOOL PARKING LOT
Mulberry, Florida | Completed 2017
AAA Top Quality Asphalt partnered with the Polk County School Board to complete a full parking lot reconstruction at Mulberry High School in Mulberry, Florida.
The project consisted of milling, paving, and repainting the school’s main parking lot. With the parking area completely shut down during the summer break, AAA was able to mobilize its team and complete the entire project in one complete day.
COMPLETE MILL, PAVE & STRIPE — IN ONE DAY
AAA milled approximately 6,440 square yards of the existing parking lot and replaced the pavement with approximately 708 tons of SP 12.5 asphalt.
The new asphalt was installed at a 2-inch depth in one lift, providing a complete and efficient paving operation from start to finish.
Once paving was completed, AAA’s team finished the parking lot with the required pavement markings and striping, restoring the parking layout for the upcoming school year.
ONE PHASE. ONE LIFT. ONE DAY.
The project was strategically scheduled during the summer when school was out of session, allowing AAA Top Quality Asphalt to maximize production without interfering with normal school operations.
The entire scope was completed in one total phase and one complete day.
AAA’s experienced team coordinated the milling, paving, and pavement marking operations to keep the project moving continuously and eliminate unnecessary downtime between construction phases.
SELF-PERFORMED BY AAA TOP QUALITY ASPHALT
AAA Top Quality Asphalt self-performed the complete project, utilizing our own experienced crews and equipment.
Our team was responsible for:
• Existing asphalt milling
• Asphalt paving
• Placement of approximately 708 tons of SP 12.5
• 2-inch asphalt installation in one lift
• Parking lot striping and pavement markings
• Final cleanup and completion
Keeping the work self-performed allowed AAA to maintain direct control over production, scheduling, manpower, equipment, and quality throughout the project.
PROJECT HIGHLIGHTS
Owner: Polk County School Board
Facility: Mulberry High School
Location: Mulberry, Florida
Year Completed: 2017
Contractor: AAA Top Quality Asphalt
• 6,440 SY mill and pave
• 708 tons of SP 12.5 asphalt
• 2″ asphalt thickness
• One 2″ lift
• One total phase
• Complete parking lot repainting and striping
• One-day total construction schedule
• 100% self-performed by AAA Top Quality Asphalt
MAXIMIZING PRODUCTION WITH MINIMAL DISRUPTION
The Mulberry High School project is another example of AAA Top Quality Asphalt’s ability to plan, coordinate, and execute large-scale paving operations within extremely tight schedules.
By taking advantage of the summer school shutdown, AAA was able to complete the entire mill, pave, and striping operation in one day, allowing the parking lot to be ready for the return of students and staff.
This project demonstrates AAA Top Quality Asphalt’s commitment to efficient construction, high production, and minimizing disruption to active educational facilities.